NCRTC Invites Bids for Geotechnical Work on 70km Stretch of RRTS
The National Capital Region Transport Corporation (NCRTC) has issued bids for geotechnical work on the Delhi-Dharuhera stretch of the 70.72 km-long Regional Rapid Transit System (RRTS) corridor, commencing from Sarai Kale Khan Depot. The RRTS corridor, with 13 stations and terminating at Dharuhera in Haryana, will run along National Highway-48 (NH-48). The stations along the route include Cyber City (underground), IFFCO Chowk (elevated), Rajiv Chowk (underground), and Hero Honda Chowk (underground). The scope of work involves conducting survey work for the underground and elevated sections on the revised alignment between Aerocity to Kherkidaula and Dharuhera Depot of the SKK (Sarai Kale Khan)-Dharuhera RRTS Corridor. The route spans 48.35 km in Haryana and 22.37 km in Delhi, featuring a majority of the Delhi segment underground and the Haryana segment elevated, with 16.28 km underground.