NCRTC to operationalise Duhai and Meerut South section in RAPIDX Phase-II
In the second phase of the operation of RAPIDX train services, National Capital Region Transport Corporation (NCRTC) will operationalise the section between Duhai to Meerut South station. The distance between Duhai and Meerut South Station is about 25 km where the construction of the viaduct has been completed. The total length of up and down lines in this section is 50 km, of which more than half of the tracks have been laid. Apart from that, traction works like mast cantilever erection, etc., are being carried out. Presently, track laying activities are in progress on war footing. A 17-km priority section of Delhi-Ghaziabad-Meerut RAPIDX corridor has already become operational from Sahibabad to Duhai.