Vertical rescue tunnel underway for trapped workers at collapsed site

Vertical rescue tunnel underway for trapped workers at collapsed site

Rescue operations are underway at full swing to save the 41 trapped workers in the Silkyara Tunnel in Uttarkashi. The government is committed to saving the lives of all the workers, maintaining constant

Read more …

Thailand unveils $28 bn Landbridge project to link Asia-Pacific with India & Middle East

Thailand unveils $28 bn Landbridge project to link Asia-Pacific with India & Middle East

Thailand introduces a groundbreaking $28 billion initiative, the Landbridge project, to significantly reduce shipping times between the Indian and Pacific oceans by bypassing the congested Malacca Strait

Read more …

Silkyara tunnel collapse sparks urgent rescue operation in Uttarakhand

Silkyara tunnel collapse sparks urgent rescue operation in Uttarakhand

In Silkyara, Uttarakhand, the under-construction Silkyara Tunnel, part of the Char Dham all-weather road project by the National Highways and Infrastructure Development Corporation Limited (NHIDCL), experienced a collapse on Sunday at 5:30 a.m.

Read more …

BRO completes 260-m Kandi Tunnel on Jammu-Poonch highway

BRO completes 260-m Kandi Tunnel on Jammu-Poonch highway

The Border Roads Organisation has achieved a breakthrough in the construction of the 260-metre Kandi tunnel along the Jammu-Poonch national highway. Commenced in March, the tunnel work has made a remarkable progress despite adverse weather

Read more …

Punjabi Bagh Flyover completion deadline extended to January 2024

Punjabi Bagh Flyover completion deadline extended to January 2024

The completion deadline for the Punjabi Bagh flyover has been extended to January next year. Significant portion of the work had been finished, with only the installation of a 50-meter steel girder over the intersection near Bharat Darshan Park is

Read more …

Gadkari approves 7 bridge projects worth Rs. 118.50-cr in Arunachal Pradesh

Gadkari approves 7 bridge projects worth Rs. 118.50-cr in Arunachal Pradesh

Union Minister for Road Transport and Highways Nitin Gadkari has approved seven Bridge projects in Arunachal Pradesh, under the Setu Bandhan Scheme, with a cumulative cost of Rs 118.50 crores, in the fiscal year 2023-24. The approved bridges include RCC

Read more …

Work of 250-meter viaduct and 395-meter Maroge Tunnel in J&K completed at Rs. 82-cr: Gadkari

Work of 250-meter viaduct and 395-meter Maroge Tunnel in J&K completed at Rs. 82-cr: Gadkari

Union Minister for Road Transport and Highways Nitin Gadkari has informed that the construction of a 250- meter viaduct (2-lane) in conjunction with a 395- meter (2-lane) Maroge Tunnel in Jammu & Kashmir has been completed at an estimated cost of Rs 82 crores

Read more …

Bengaluru to get 190km long road tunnel

Bengaluru to get 190km long road tunnel

The state government in Karnataka has proposed the construction of a 190 km long road tunnel to alleviate traffic congestion in Bengaluru, and the tender will be floated soon. Currently, agencies are working on the details of how the tunnel road should be

Read more …

NHSRCL completes first tunnel for Mum-Ahmedabad High-Speed Rail Project

NHSRCL completes first tunnel for Mum-Ahmedabad High-Speed Rail Project

The National High-Speed Rail Corporation Limited (NHSRCL) has completed the first mountain tunnel for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor project. The work was accomplished in a short span of just 10 months. The tunnel is

Read more …

Sarai Kale Khan flyover nearing completion

Sarai Kale Khan flyover nearing completion

The new flyover at Sarai Kale Khan is on track to open soon, as the construction work will conclude within this month. This infrastructure project is being undertaken by the Public Works Department. The new 643-meter-long three-lane flyover will establish

Read more …

MMRDA awards Rs 7,000-cr road tunnel contract to L&T

MMRDA awards Rs 7,000-cr road tunnel contract to L&T

Larsen & Toubro (L&T) has bagged an order worth over Rs 7,000 crore from the Mumbai Metropolitan Region Development Authority (MMRDA). The project involves the design an underground road tunnel connecting Orange Gate on the

Read more …

RVNL secures L1-bid for tunnels construction in Dharakoh Maramjhiri section

RVNL secures L1-bid for tunnels construction in Dharakoh Maramjhiri section

Rail Vikas Nigam Limited (RVNL) has been declared the lowest bidder (L1) by Central Railways for the construction of tunnels in Dharakoh Maramjhiri section. The estimated cost of the project is Rs 311.17 crore, and expected to be completed within 18 months

Read more …

BMC starts work to rebuild Bellasis Bridge in Mumbai

BMC starts work to rebuild Bellasis Bridge in Mumbai

The Brihanmumbai Municipal Corporation (BMC) has commenced work to build a brand-new cable-stayed steel bridge, by replacing the aging Bellasis Bridge in the metropolitan city. This transformation is essential to accommodate the ever

Read more …

Work on Kapashera-NH 8 tunnel is 80% complete

Work on Kapashera-NH 8 tunnel is 80% complete

The work on the tunnel connecting Kapashera border to NH-8 is 80 percent complete. The National Highway Authority of India (NHAI) has claimed that the tunnel between the Haryana border and IGI Airport Terminal 3 in Delhi, will cut down travel time massively

Read more …

NCRTC floats tender to enhance mobile link in tunnels

NCRTC floats tender to enhance mobile link in tunnels

To keep the mobile network performance in top gear, especially within the underground corridors, the National Capital Region Transport Corporation (NCRTC) has initiated a tender process to enhance mobile network connectivity for train commuters

Read more …

CMRL hastens tunneling work on Phase-II corridor

CMRL hastens tunneling work on Phase-II corridor

The CMRL has fast tracked the tunneling work on Phase-II metro rail corridor connecting Kellys and Taramani Road Junction stations. Contractor L&T has pressed into service the Tunnel Boring Machine (TBM) DZ1040, named Siruvani, for the project

Read more …

Maha-Metro Launches Tunneling Work on Metro Line 7A

Maha-Metro Launches Tunneling Work on Metro Line 7A

In its mission to transform Mumbai's transportation landscape, the MMRDA has recently announced the commencement of tunneling work for Metro Line 7A (ML7A). The first TBM, named T62, has recently embarked on its journey, marking the beginning

Read more …

MoRTH launches work to upgrade Khellani tunnel in J&K

MoRTH launches work to upgrade Khellani tunnel in J&K

The Union Road Ministry has commenced construction work on the two-laning of Khellani tunnel in Doda district of Jammu and Kashmir. The ministry is upgrading the uni-directional Khellani tunnel structure incorporating a paved shoulder and improving

Read more …

MahaRail to build bridge on Ghatkopar-Andheri link road

MahaRail to build bridge on Ghatkopar-Andheri link road

The Maharashtra Rail Infrastructure Development Corporation (MahaRail) has decided to build a cable stayed bridge on the Ghatkopar-Andheri Link road in a phased manner to replace the old and dilapidated Ghatkopar ROB on the given road stretch

Read more …

NCRTC completes tunneling on Delhi-Meerut RRTS Corridor

NCRTC completes tunneling on Delhi-Meerut RRTS Corridor

In a major accomplishment towards faster regional connectivity in NCR, the National Capital Region Transport Corporation (NCRTC) has achieved a milestone by completing tunnelling work on the entire Delhi – Ghaziabad – Meerut RRTS Corridor. The task

Read more …

Tender floated for Rs 281.3-cr bridge construction in K’taka

Tender floated for Rs 281.3-cr bridge construction in K’taka

The South Western Railway has floated a tender for the construction of a bridge across Krishna River in Gadag-Wadi new line project in Karnataka. The project at an estimated cost of Rs 281.3 crore is expected to be completed in a period of 24 months

Read more …

DMRC floats tender for Rs. 426.88-cr tunnel in Patna

DMRC floats tender for Rs. 426.88-cr tunnel in Patna

Delhi Metro Rail Corporation (DMRC) has issued an e- tender for the construction of a single tunnel between Bihar and Patna Museum with an estimated investment of Rs. 426.88 crores. The scope of work in the contract PC-08R includes design and

Read more …

NHAI sets up Design Division

NHAI sets up Design Division

For effective review of design and construction of bridges, specialized structures and tunnels, NHAI has set up a Design Division that will formulate policy and guidelines for planning, designing, construction and maintenance of bridges, structures

Read more …

Multi-level flyover inaugurated in Pune to tackle traffic woes

Multi-level flyover inaugurated in Pune to tackle traffic woes

Union Minister of Road Transport and Highways unveiled a multi-level flyover at Pune's Chandni Chowk, a step aimed at alleviating traffic congestion in the city. The inauguration was attended by Deputy Chief Ministers Devendra Fadnavis and Ajit Pawar

Read more …

Bihar sanctions Rs 542-cr for construction of world-class heritage tunnel

Bihar sanctions Rs 542-cr for construction of world-class heritage tunnel

The Bihar government has sanctioned Rs 542 crore for the construction of a 'world-class heritage tunnel', a subway that will connect Bihar Museum with the Patna Museum. The project has already been assigned to Delhi Metro Rail Corporation (DMRC)

Read more …

Work under Adyar river in Chennai to begin from Sept

Work under Adyar river in Chennai to begin from Sept

The work under the river Adyar near Greenways Road metro station will begin from the next month in Chennai. A machine will go 20 meters under the river to begin boring a 400-metre-long tunnel. The tunnel boring machine (TBM), named Kaveri, began

Read more …

MoRTH approves Rs 300-cr to rebuild bridges in HP

MoRTH approves Rs 300-cr to rebuild bridges in HP

The Union Transport ministry has approved Rs 300 crore for the reconstruction of bridges damaged by the recent flash floods in Himachal Pradesh. The funds have been sanctioned under the Setu Bharatam Yojna for reconstruction of damaged bridges

Read more …

Work on Zojila tunnel to be over by 2030

Work on Zojila tunnel to be over by 2030

The 13 km-long Zojila Tunnel is said to be completed by December 2030, while its 40 percent work has already been completed. The Zojila tunnel said to be the longest of its kind in Asia and at the highest altitude will significantly cut down the time to

Read more …

NHAI unveils Dhaula Kuan-Manesar elevated corridor

NHAI unveils Dhaula Kuan-Manesar elevated corridor

The National Highway Authority of India (NHAI) is set to construct a two-layer elevated road over NH-8, connecting Dhaula Kuan to Manesar, aimed at alleviating traffic congestion on this route. The elevated road will be exclusively for light vehicles and is

Read more …

MP PWD invites bids for Rs 684-cr flyover construction in Gwalior

MP PWD invites bids for Rs 684-cr flyover construction in Gwalior

The Public Works Department, Madhya Pradesh, has issued a bid invitation for the construction of a four-lane elevated corridor/flyover in Gwalior city, Gwalior district (Phase-II). The elevated corridor, with an estimated contract value of Rs 684.37 crore, will

Read more …

Page 1 of 4

To get latest updates on whatsapp, Save +91 93545 87773 and send us a 'Saved' message
Click Here to Subscribe to Our eNewsletter.